What does an Athens bath remodel cost in 2026?

Three bands. $17K-$26K cosmetic refresh (keep layout, new vanity, fixtures, tile). $30K-$42K standard remodel (curbless shower conversion, new venting, supply re-pipe, panel run, heated floor). $46K-$54K primary-suite expansion (closet wall removed, freestanding tub, double vanity, walk-in tiled shower). All include EPIC-LA permits, Title 24 where triggered, 10% contingency.

How long is the project end to end?

5 to 8 weeks of construction, plus 2 to 5 weeks of EPIC-LA permit time on the front. We do not start demo until all long-lead items — tile, fixtures, vanity — are physically delivered.

Will I need to replace the supply lines?

On nearly every original 90044 home, yes. The galvanized lines from the 1950s have corroded internally and your shower flow proves it. We re-pipe back to the main in PEX or copper as part of standard scope, not a separate upcharge.

Do you handle aging-in-place bath conversions?

Yes. Zero-threshold curbless shower with a real waterproof pan, grab bars blocked into framing, comfort-height toilet, lever-handle fixtures, slip-resistant floor tile, and lighting rated for reading prescription labels. Built into the framing during rough-in, not bolted on later.

Are permits required for an Athens bath remodel?

Yes if you are moving plumbing, changing electrical, or touching the envelope — which is almost every real remodel. EPIC-LA issues the permit. Skipping permits is the fastest way to blow up a resale or refinance, and we will not work without them.

Do you offer bilingual project management?

Yes. Spanish-fluent PM is standard on Athens jobs. Written change orders, contracts, and milestone updates available in Spanish on request.

How do you handle waterproofing for the long run?

Schluter Kerdi or equivalent sheet membrane behind every wet-wall tile surface. Full-pan waterproofing under any curbless shower. A documented 24-hour water test before tile substrate. The full photo log lives in your project portal.

Free On-Site Bathroom Remodeling Walkthrough in Athens

Get a fixed-price bid before demo. CSLB #1105249 GC since 2023. Architectural design firm since 2016. 200+ LA builds. BBB A+ accredited. Bonded and insured.

Book Free 48h Walkthrough →