Architectural Design in Malibu

Most Malibu architects design beautiful drawings that get sent back from Coastal Commission three times. We design drawings that go through CDP review on the first pass because we've been doing it since 2016 and we coordinate every sheet against the Coastal staff planner, the biologist, the geotech, the fire-zone spec, and the OWTS engineer before we hand you a permit set. We're also the CSLB-licensed GC since 2023, so if you build with us, the architect and the builder are the same phone call. Real cost band for Malibu architectural design: $30-$120K depending on scope, typically 6-12% of the construction budget.

Since 2016Architectural Design (CSLB GC Since 2023)
200+LA Builds Completed
5.0★Google Business Rating
A+BBB Accredited

What Malibu architectural design actually costs in 2026

Off real Malibu projects in the last 18 months: $30-$55K for a focused interior remodel design package on an administrative-track CDP, $55-$85K for a substantial whole-home remodel that triggers full CDP and Chapter 7A re-cladding, and $85-$120K for a ground-up custom home with bluff geotech, ESHA mitigation, and OWTS engineering coordination. The fee covers schematic design, design development, construction documents, structural engineering coordination, Title 24 2022 energy modeling, Coastal Commission filings, and permit-set drawings through Malibu City Building Department approval.

We don't charge for the first site visit, the first lot read, or the first scope-risk conversation. We tell you on day one whether the project is worth designing or whether the constraints will eat the budget. About 30% of Malibu projects we look at we recommend not designing. We're straight about that.

How we coordinate the Coastal Commission, the city, and the consultants

Standard architectural practice in Los Angeles is to design first, submit second, and let the agencies push back. That doesn't work in Malibu. We pre-app with Coastal staff before schematic design is final, walk the biologist on the lot before the survey is commissioned, get the geotech investigation scoped to the actual structural load, and coordinate the OWTS engineer with the lot drainage plan before any of it goes to permit. Done that way, Coastal Commission CDP review on a clean Malibu file is 6-12 weeks instead of 6-12 months.

We've handled administrative and regular CDPs on Point Dume, Malibu Road, Big Rock, Las Flores, La Costa Beach, Latigo Shores, and Paradise Cove. We know the staff planners and the corridor rules.

Chapter 7A and the design choices that matter

Chapter 7A isn't an afterthought you add to a finished design. It changes window placement (tempered or fire-rated glazing on exposed elevations), eaves and overhangs (ignition-resistant boxed soffits), siding selection (no untreated wood within 6 feet of grade), and roof spec (Class A only, often standing-seam metal or concrete tile). We design Chapter 7A in from schematic, not bolted on at construction documents. That keeps the architecture honest and the cost predictable.

For Mulholland Scenic Parkway parcels, Big Rock, and any HOA-overlaid corridor, we also coordinate the design against the view-corridor and aesthetic-review rules so the drawings don't come back from Planning with mandatory changes after Coastal approves.

Why hire the architect who is also the GC

When the architect and the GC are the same firm, change orders disappear, RFIs disappear, the bid is the bid, and revisions update both the drawings and the budget the same week. We've been the architectural design firm since 2016 and the CSLB-licensed GC since 2023. 200+ LA builds in the file. You can hire us to design only, and we'll deliver a permit-ready Malibu file. You can hire us to design and build, and the two phases collapse into one accountable phone call. Your choice. We don't pressure either way.

Post-fire rebuilds, expedited tracks, and insurance documentation

For Woolsey and Palisades fire rebuilds, the expedited Coastal Commission track applies if the new home stays within 110% of the original permitted footprint and meets current Chapter 7A spec. We've handled multiple post-fire rebuilds and we coordinate the architectural drawings against the insurance documentation, the original permit record, and any FEMA or state recovery program requirements. The expedited entitlement runs 8-14 weeks instead of 9-18 months, but the spec floor is current code, not what burned.

We've also handled lender-required documentation, appraisal coordination for construction loans, and the as-built versus permitted reconciliation that often shows up on older Malibu parcels where decades of un-permitted work need to be cleaned up before a new permit can issue. That cleanup is part of the design scope when it applies.

Full integrated outdoor living, decks, and the seawall-or-bluff edge condition

Most Malibu architectural design includes substantial outdoor living: covered loggias, integrated outdoor kitchens, fire features, pools or spas, and deck systems that extend the conditioned living over the bluff or surf-facing edge. Decks over 30 inches above grade require structural engineering, Chapter 7A spec on the framing (ignition-resistant lumber or steel), and on bluff lots a geotech-coordinated cantilever or pier-supported design. Seawall conditions, where applicable, require Coastal Commission separate review and often a separate structural engineer specializing in marine work. We coordinate all of it.

Architectural Design Questions Homeowners Ask About Architectural Design in Malibu

Do you work with my preferred GC if I just want the design?

Yes. About 30% of our Malibu design clients build with another GC. We deliver a clean permit-ready Coastal-cleared file and we hand off the engineering. The design fee doesn't depend on you building with us.

How long does Malibu architectural design take?

Interior-only remodel: 8-14 weeks from schematic to permit set. Substantial remodel with CDP and Chapter 7A: 16-24 weeks. Ground-up custom home: 24-36 weeks for design, in parallel with 9-18 months of Coastal entitlement.

Do you handle Title 24 2022 energy modeling?

In-house. Title 24 energy compliance, CALGreen, and any local Malibu sustainability overlay all coordinated against the architectural drawings. No separate energy consultant required for standard residential.

What if Coastal sends my drawings back?

We revise at no additional design fee if the revision is on a code-or-spec issue we should have caught. We charge for client-initiated program changes and for revisions triggered by neighbor objections during the public-hearing window. The terms are in the contract before you sign.

Can you do a feasibility study before I commit?

Yes. $3K-$6K for a Malibu lot feasibility: title review, Coastal overlay check, ESHA mapping, geotech preliminary, OWTS feasibility, fire-zone read, and a one-page buildable-massing diagram. Credited toward design fee if you move forward.

Do you work on post-Woolsey or post-Palisades fire rebuilds?

Yes. We've handled multiple post-fire rebuilds on permitted footprints within 110% of original. Expedited Coastal track, current Chapter 7A spec, and we coordinate the insurance documentation with the structural plans.

What's included in the design fee?

Schematic design, design development, construction documents, structural engineering coordination, Title 24 energy modeling, Coastal Commission filings, biological and geotech coordination, OWTS coordination if applicable, and permit-set drawings through Malibu City Building Department approval.

Do you do bluff or hillside-only designs?

We do. Caisson, soldier-pile, and tie-back retaining are part of multiple files in our portfolio. We coordinate the geotech load against the structural design and the architectural program from schematic forward.

Free On-Site Architectural Design Walkthrough in Malibu

Text 818-605-1388 or call 24/7. Free Malibu lot read, feasibility conversation, real fee band. No commit, no pressure, no follow-up if you say all set.

Book Free 48h Walkthrough →